A Control Plan is an action plan to mitigate the failure risks identified in a PFMEA.
The Process Steps in the PFMEA are linked to the Process Steps in a related Control Plan through the Process Step number. The Process Step Number should therefore be consistent across PFMEAs and Control Plans.
FMEA Executive gives you a facility to create Control Plans.
A Control Plan is a plan to control Product and Process characteristics. It documents what needs to be measured and controlled and how the control needs to be put in place in the process.