Prior to an inspection, the following materials are usually reviewed:
a. The GLP regulations;
b. the Management Briefings Post-Conference Report;
c. assorted memoranda and policy issuances;
d. the GLP Compliance Program;
e. the protocol of an ongoing study, if available;
f. the final report of a completed study, if available;
g. the inspection report of the most recent inspection.